Water Mains

New Water Connection

Stanwell, London

Tapping saddle fitted to a water main for a new connection at Stanwell, London by Cascade Water Services

Overview

Our team was approached by a client in Stanwell, London, who required a new water main connection for their site. The location had previously been without a dedicated mains water supply, making it difficult to maintain operations and meet regulatory standards. The client needed a reliable, compliant solution to ensure consistent water flow while awaiting approval for a permanent supply connection.

Our solution

Following an initial site assessment, our engineers identified the most effective route for the new water main and worked closely with the local water authority to coordinate all necessary approvals. To maintain business continuity, we installed a temporary water connection that provided a dependable supply throughout the project. Once approved, the permanent mains connection was installed to full specification, meeting both the client’s operational requirements and industry standards.

The result

The project was completed efficiently and with minimal disruption to site activities. The client now benefits from a fully functional and compliant water main connection, ensuring long-term reliability and peace of mind. Our proactive approach and collaboration with the water authority ensured a smooth process from start to finish.

Discipline
Water Mains
Location
Stanwell, London

Similar job?

Tell us what you are dealing with.

Most of what we do looks like one of these. Describe the property or the site and the right engineer picks it up.

Or reach us directly

Burst main or major leak? The freephone line is answered 24 hours a day.

Request a quote

Site layouts, utility drawings, correspondence or photos of the problem. Up to 5 files, 15MB in total — PDF, JPG, PNG, HEIC, DWG or DXF.

We use these details to answer your enquiry and nothing else.