A water package you can hand over and stop thinking about

Accredited, pre-qualified and self-delivering. Plant, operatives, traffic management and reinstatement are ours, so the water element is a package on your programme rather than four subcontractors and a risk register entry.

Burst main or loss of supply on site?Call 0800 520 0043

The sector

You are buying certainty, not pipework.

A main contractor does not need to be told what MDPE is. What matters is whether the water package arrives with the right accreditations, clears pre-qualification without a fortnight of chasing, turns up when the programme says, and does not generate an RFI every second day.

Cascade is LRQA WIRS-accredited to undertake eligible self-lay and contestable works within our accredited scope, and holds SSIP-recognised safety accreditation through SafeContractor, SMAS Worksafe and Acclaim, alongside Constructionline Gold and Achilles UVDB Silver Plus. That is the paperwork already done.

We self-deliver. Excavation, mains, ducting, connections, testing, highway works and reinstatement are all in-house, which means one point of contact and no gap between trades for a problem to live in.

Pre-qualifying us? The full credential list — accreditations, insurance limits, operative competence and site capability — is set out on our capability page, with a statement to download for your tender pack.

What you need from us

The packages we are usually novated into.

  1. 01You need the paperwork before you can let the package

    Capability & pre-qualification

    Accreditations, £10m public liability, NRSWA, hygiene and plant competence, traffic management and reinstatement — listed in full, with a capability statement to download.WIRS, SSIP and Constructionline Gold£10m public liabilityCapability statement PDFRead more
  2. 02The scheme needs mains and connections

    Water Mains

    Distribution mains, mains and service connections up to and above 355mm, and live main tapping, delivered to water industry specification with testing and certification included.WIRS accredited deliveryAccredited to 355mm and aboveCertified on handoverRead more
  3. 03Multiple utilities share a corridor

    Utility Ducting

    Coordinated multi-utility trenching to Street Works UK guidance, including road crossings, duct proving and reinstatement to the highway authority’s specification.One excavation, several servicesHighway works in-houseAs-builts issuedRead more
  4. 04Pipework is laid and needs signing off

    Pressure Testing & Certification

    Hydrostatic testing, chlorination, sampling and certification — available as a standalone service on pipework your own teams have installed.Available standaloneAccredited certificationFailures fixed, not just reportedRead more
  5. 05Nobody is certain what is buried there

    Utility Surveying & Pipe Tracing

    Records review, electromagnetic and radar detection and verification, so excavation is planned against what is actually underground rather than an indicative drawing.PAS 128 quality levelsVerified where it mattersStrikes avoidedRead more

Why Cascade

The reasons a package manager cares about.

  1. 01

    Pre-qualification already done

    SafeContractor, SMAS Worksafe, Acclaim, Constructionline Gold and Achilles UVDB Silver Plus. Onboarding is a form, not a project.

  2. 02

    WIRS accredited for adoptable work

    The Water Industry Registration Scheme is what allows work on networks intended for adoption — and what stops a finished asset being rejected.

  3. 03

    We self-deliver

    Plant, operatives, traffic management and reinstatement are ours. No second-tier subcontractor to manage and no gap in the programme where a handover should be.

  4. 04

    Thirty years of live-site work

    Three decades working around existing services, occupied buildings and live highways across London and the Home Counties.

  5. 05

    24/7 when something fails

    A burst on a live site does not wait for the next working day, and neither do we.

Independently assessed

Full accreditation detail on the about page.

Contractor enquiry

Send the water package and the programme dates.

Drawings, scope and the dates you are working to are enough for us to price it properly and tell you where the programme risk actually sits.

Or reach us directly

Burst main or major leak? The freephone line is answered 24 hours a day.

Request a quote

Site layouts, utility drawings, correspondence or photos of the problem. Up to 5 files, 15MB in total — PDF, JPG, PNG, HEIC, DWG or DXF.

We use these details to answer your enquiry and nothing else.